Other design considerations included sound mitigation between apartments. The C2 team focused on selecting finish selections that would minimize disruptions between tenants.
Energy-efficient, climate-controlled units were also a design focal point. Each unit has a wall-mounted, ductless heating/cooling unit that can be zoned and timed around occupants’ schedules.