The exterior of the building features the incorporation of multiple materials including the use of a Nichiha wall system in both vertical and horizontal orientation with a thin stone veneer at the base of the building. Fiber cement siding was also used at the rear of the building to be mindful of
the client’s budget while still maintaining their vision.
Construction will wrap at the end of 2024.